Kermi steel radiators plant - construction progress

Every construction process is unique and depends on the scope and complexity of the project. But each time a sustainable plant is built, the process follows all necessary steps and in the result we may find out another successfully completed project.

In 2017 after 20 years of successful business in Russia Kermi GmbH came to a very important strategic decision – to construct a plant for production of steel panel radiators in Stupino (Moscow region).

Kermi new production plant is going to have an area of 15 000 sq. meters and is being designed to output up to 500 000 steel panel radiators per year.

As the General engineer and project manager, eastconsult OOO is honored to disclose the current situation at the construction site of Kermi plant – all the basic works are executed and the steel buildings are almost completed.

The plant will be put into operation by the end of 2018 as it was stated by the initial time schedule.